Icon Background

Media

Victoria Central

Client – Weston Homes
GDV – £53m
Contract value – £3.24m

Development overview
Victoria Central is a new development of 217 luxurious one, two and three bedroom apartments spread across fourteen floors in the town of Southend-on-Sea, Essex.

“We were dealing with a limited site footprint at Victoria Central. UNipanel helped to reduce site waste and site storage, and delivered dry envelope faster, which enabled interior fitouts to happen sooner. The overall result was quicker handovers.” Jeremy Kealy, Site Manager

“In total, we were able to reduce the programme timescales by six months. This meant we could secure the use of Help to Buy, which was coming to an end, and we were able to save over £600,000 in preliminary costs alone.” Peter Gore, Group Operations Director, Weston Group Plc

Superstructures – £2.4m
UNipanel 200, latest fire regulations. A1/A2 fire rated infill system, permanent slab formwork, traditional masonry facade support system, ALuK aluminum windows and doors.

Internal Fitout – £844k
300 no. BOS Fitout bathrooms, bespoke to client bathroom system, with fitted vanity unit, taps, shower trays, shower screens, showers, baths, bath panels, tiles. 180no. BOS Fitout wardrobe systems with mirrored sliding doors, shelf pack, hanging rail, timber decors.
180 no. BOS Fitout quartz kitchen worktops, laser templated, CNC machined, sink/hob/tap/water filter instant boiling water installation within worktops.