Icon Background

Media

Posted on: August 27, 2025

Victoria Central, Southend

Client – Weston Homes
GDV – £52.8m
Contract value – £3.24

Building Type – Apartment

No. Apartments – 217
No. Storeys – 14
No. Blocks – 5

System – UNisystemSFS

Installation year – 2021

Victoria Central in Southend-on-Sea delivers 217 one, two, and three-bedroom apartments across 14 storeys on a tight 0.98-acre site. Completed in August 2022 in just 143 weeks, the scheme combines urban convenience with coastal living.

British Offsite was engaged to manufacture and supply UNisystemSFS to form the superstructure. As a high-density scheme with a constrained footprint, the development posed logistical challenges, including limited delivery and storage capacity in an urban setting. The goal was to secure the building envelope quickly, minimising on-site personnel and disruption, while ensuring programme certainty.

The solution came through British Offsite’s advanced UNisystemSFS light gauge steel system — a pre-manufactured panel complete with insulation, doors, windows, vent apertures, fire stopping, and façade fixing systems. By consolidating five trades into one offsite process, the system was delivered from final design to site in just 120 days, enabling a fast and efficient installation.

This approach allowed dry envelopes to be completed 14 weeks faster than traditional methods — a 20% programme time saving. The accelerated build reduced exposure to weather delays, improved health and safety, streamlined fit-out, and allowed earlier property viewings, boosting sales and improving cashflow for the client.

“Working with British Offsite and their UNisystemSFS panels, we were able to reduce the programme timescales by six months, and save over £600,000 in preliminary costs alone.”

Peter Gore
Group Operations Director
Weston Group Plc

Superstructures – £2.4m
UNisystemSFS designed for use in buildings of over six storeys and up to any finished height.

BOSFitout – £844,000
300 no. BOSFitout bathrooms, bespoke to client bathroom system, with pre-plumbed vanity unit, taps, shower trays, shower screens, showers, baths, bath panels, tiles.
180 no. BOSFitout wardrobe systems with mirrored sliding doors, shelf pack, hanging rail, timber decors.
180 no. BOSFitout quartz kitchen worktops, laser templated, CNC machines, sink/hob/tap/water filter instant boiling water installation within worktops.

Discover UNisystemSFS here